 |
|
Realization
|
|
 |
Always think and act in the interest of the Customer |
 |
Intensive use of Check Lists |
 |
Document early, continuously, carefully (UML, JavaDoc, Templates) and usable (hyperlinked) |
|
 |
|
1. Project Initialization (15% of project time)
|
|
|
- Analyze the Top-Level Specification
- Use check lists to ensure a complete coverage of user requirements
- Prepare an initial realization proposal
- Discuss with the partner/user what he needs - NOT what he wishes
- Analyze the Detail Specification and the Requirements List
- Prepare the final realization proposal
- Prepare and sign the contract
|
|
2. Project Realization
|
|
|
OO - Cycle (OO: object oriented) |
|
|
|
- Specify the Design
- Write a Test Specification
- Implement the Component
- Test and write the Test Protocol
- Write the Installation-/Operation Manual
- Write the System Documentation
- Examine the system and write the Correction list (if necessary)
|
|
|
|
3. Receive the Contract fulfillment Confirmation
|
|
|
|
|
|
|
 |
|